Aller au contenu
CRL Library Catalog
Center for Research Libraries Center for Research Libraries
  • Accessing the CRL Collection
  • About the Catalog
  • Votre compte
  • Connexion
  • Langue
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
Recherche avancée
  • Rechercher
  • A Feasibility study on second...
  • Citer
  • Envoyer par SMS
  • Envoyer par courriel
  • Imprimer
  • Exporter les notices
    • Exporter vers RefWorks
    • Exporter vers EndNoteWeb
    • Exporter vers EndNote
  • Ajouter aux favoris
  • Permalien

A Feasibility study on second stage development of the Belilas (Rengat) transmigration project : final report

Enregistré dans:
Détails bibliographiques
OCLC:26095264
Collectivité auteur: Enarec Consult, PT
Langue:English
Publié: Jakarta : Enarec Consult, 1986.
Format:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

  • Exemplaires
  • Description
  • Affichage MARC
Borrow this resource

Item List

Description Local Call Number Statut
1 of 4 91/50343 (H) Disponible
2 of 4 91/50343 (H) Disponible
3 of 4 91/50343 (H) Disponible
4 of 4 91/50343 (H) Disponible

Documents similaires

  • Second stage development programme (SSDP), preliminary feasibility studies, Rengat WPP VII, Riau : final report
    Publié: (1987)
  • A Feasibility study of second stage development of Air Sugihan Transmigration project in South Sumatera : final report
    Publié: (1986)
  • Feasibility study for the development of transmigration settlement, phase II (second stage development), Pasir Pangarayan Project, Riau Province : final report
    Publié: (1986)
  • Second stage development programme (SSDP), preliminary feasibility studies : Ipuh WPP II, Bengkulu : final report
    Publié: (1987)
  • Feasibility study on transmigration settlement project (second stage development), location Bunga Mas WPP V-A. B, Lahat Regency, South Sumatera Province : final report
    Publié: (1986)

Options de recherche

  • Historique de recherche
  • Recherche avancée
  • Parcourir le catalogue

Besoin d'aide ?

  • Accessing the CRL Collection
  • Astuces pour la recherche

Follow CRL

Sign up for the Connect Newsletter

Leave Feedback

  • Accessibility Statement
  • Privacy Policy
  • Powered by VuFind and FOLIO
Chargement en cours...