Joan edukira
CRL Library Catalog
Center for Research Libraries Center for Research Libraries
  • Accessing the CRL Collection
  • About the Catalog
  • Zure kontua
  • Bazkideak
  • Hizkuntza
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
Aurreratua
  • Final report, SKP structure pl...
  • Erreferentzia bihurtu
  • SMS
  • Bidali
  • Imprimir
  • Erregistroa esportatu
    • Nora RefWorks
    • Nora EndNoteWeb
    • Nora EndNote
  • Gogokoenen artean sartu
  • Permanent link

Final report, SKP structure planning (phase II) WPP/SKP XIXc/G Nanga Mau /

Gorde:
Xehetasun bibliografikoak
OCLC:18221115
Erakunde egilea: Sinotech Engineering Consultants
Hizkuntza:English
Argitaratua: [Jakarta] : Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, [1985]
Formatua:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

  • Aleari buruzko argibideak
  • Deskribapena
  • MARC erregistroa
Deskribapena
Alearen deskribapena:Master microform held by: DLC.
Deskribapen fisikoa:108 p. in various pagings : ill., maps (some folded) ; 29 cm.

Antzeko izenburuak

  • Final report, SKP structure planning (phase II) WPP/SKP XIXc/C Nanga Mau
    Argitaratua: (1985)
  • Structure planning (phase II) final report for WPP/SKP/ XIXc/B Nanga Mau : structure planning (phase II) and detailed engineering planning (phase IIIA) for transmigration settlement, West Kalimantan (package D)
    Argitaratua: (1985)
  • Final report detailed engineering planning (phase IIIA) for WPP/SKP XIXc/C Nanga Mau
    Argitaratua: (1986)
  • Final report detailed engineering planning (phase IIIA) for WPP/SKP XIXc/B Nanga Mau
    Argitaratua: (1987)
  • Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)
    Argitaratua: (1986)

Bilaketa aukerak

  • Bilaketaren historia
  • Bilaketa aurreratua
  • Katalogoa arakatu

Laguntza behar al duzu?

  • Accessing the CRL Collection
  • Bilaketa egiteko aholkuak

Follow CRL

Sign up for the Connect Newsletter

Leave Feedback

  • Accessibility Statement
  • Privacy Policy
  • Powered by VuFind and FOLIO
Lanean...