Phase IIIa, final report, regional context report, Sarmi Sub-Region : structure planning (phase II) and detailed engineering planning (phase III) for transmigration settlement package H, Irian Jaya

Saved in:
Bibliografiske detaljer
OCLC:20697035
Corporate Authors: PRC Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Tricon Jaya, P.T
Sprog:English
Udgivet: Jayapura, Irian Jaya : PRC Engineering : Tricon Jaya, [1986]
Fag:
Global Resources Program:South Asia Materials Project (SAMP)
Format:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Beskrivelse Local Call Number Status
87/50655 Tilgængelig