Ir para o conteúdo
CRL Library Catalog
Center for Research Libraries Center for Research Libraries
  • Accessing the CRL Collection
  • About the Catalog
  • A sua conta
  • Entrar
  • Idioma
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
Avançada
  • Final report, SKP structure pl...
  • Citar
  • Enviar por SMS
  • Enviar por email
  • Imprimir
  • Exportar registo
    • Exportar para RefWorks
    • Exportar para EndNoteWeb
    • Exportar para EndNote
  • Adic. favoritos
  • Permanent link

Final report, SKP structure planning (phase II) WPP/SKP XIX a/C Nanga Pinoh /

Na minha lista:
Detalhes bibliográficos
OCLC:18221269
Autor Corporativo: Sinotech Engineering Consultants
Idioma:English
Publicado em: [Jakarta] : Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, [1984]
Formato:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

  • Exemplares
  • Descrição
  • Registo fonte
Borrow this resource

Item List

Descrição Local Call Number Estado
1 of 2 87/80174 (H) Disponível
2 of 2 87/80174 (H) Disponível

Registos relacionados

  • Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)
    Publicado em: (1984)
  • Final report SKP structure planning (phase II) WPP/SKP XIXa/D Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)
    Publicado em: (1985)
  • Final report SKP structure planning (phase II) WPP/SKP XIXa/E Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)
    Publicado em: (1985)
  • Final report, SKP structure planning (phase II) WPP/SKP XIXc/C Nanga Mau
    Publicado em: (1985)
  • Final report SKP structure planning (phase II) WPP/SKP XIX b/B Nanga Ella
    Publicado em: (1986)

Opções de Pesquisa

  • Histórico de Pesquisas
  • Pesquisa Avançada
  • Percorrer o Catálogo

Precisa de ajuda?

  • Accessing the CRL Collection
  • Dicas de Pesquisa

Follow CRL

Sign up for the Connect Newsletter

Leave Feedback

  • Accessibility Statement
  • Privacy Policy
  • Powered by VuFind and FOLIO
A carregar...