Detailed survey and design (phase III) for transmigration settlement development in East Kalimantan, WPP Sangkulirang West (additional), SKP Kaubun, SKP Pengadan, SKP Bengalon Lembak North.
Sparad:
OCLC: | 20083807 |
---|---|
Institutionella upphovsmän: | , , |
Språk: | English |
Publicerad: |
[Jakarta] :
Pacific Consultants International in association with PT Seecons,
[1982]
|
Ämnen: | |
Materialtyp: | Regeringsdokument Monograph Microform Note that CRL will digitize material from the collection when copyright allows. |
Innehållsförteckning:
- 1. Main report
- 2. Appendix to main report.