Detailed survey and design (phase III) for transmigration settlement development in East Kalimantan, WPP Sangkulirang West (additional), SKP Kaubun, SKP Pengadan, SKP Bengalon Lembak North.

Uloženo v:
Podrobná bibliografie
OCLC:20083807
Korporace: Pacific Consultants International, Seecons Consortium, Indonesia. Direktorat Jenderal Cipta Karya
Jazyk:English
Vydáno: [Jakarta] : Pacific Consultants International in association with PT Seecons, [1982]
Témata:
Médium:

Vládní dokument Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Obsah:
  • 1. Main report
  • 2. Appendix to main report.