Phase II screening studies, final report SKP E, WPP If Berma : structure planning (phase II) and detailed engineering planning (Phase III) for transmigration settlement package H-Irian Jaya

Gespeichert in:
Bibliographische Detailangaben
OCLC:20463276
Körperschaften: PRC Engineering Consultants, Tricon Jaya, P.T, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program
Sprache:English
Veröffentlicht: Jayapura, Irian Jaya : PRC Engineering : Tricon Jaya, [1986]
Schlagworte:
Format:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Beschreibung Local Call Number Status
1 of 2 86/81417 Verfügbar
2 of 2 86/81417 Verfügbar