Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Сохранить в:
Библиографические подробности
OCLC:20719995
Корпоративные авторы: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Язык:Indonesian
English
Опубликовано: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Предметы:
Global Resources Program:South Asia Materials Project (SAMP)
Формат:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

Описание Local Call Number Статус
v.1 (1 of 4) 87/50678 Доступно
v.1 (2 of 4) 87/50678 Доступно
v.1 (3 of 4) 87/50678 Доступно
v.1 (4 of 4) 87/50678 Доступно
v.2 (1 of 3) 87/50678 Доступно
v.2 (2 of 3) 87/50678 Доступно
v.2 (3 of 3) 87/50678 Доступно
v.3 (1 of 2) 87/50678 Доступно
v.3 (2 of 2) 87/50678 Доступно
v.4 87/50678 Доступно