Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

שמור ב:
מידע ביבליוגרפי
OCLC:20719995
Corporate Authors: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
שפה:Indonesian
English
יצא לאור: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
נושאים:
Global Resources Program:South Asia Materials Project (SAMP)
פורמט:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

תיאור Local Call Number סטטוס
v.1 (1 of 4) 87/50678 זמין
v.1 (2 of 4) 87/50678 זמין
v.1 (3 of 4) 87/50678 זמין
v.1 (4 of 4) 87/50678 זמין
v.2 (1 of 3) 87/50678 זמין
v.2 (2 of 3) 87/50678 זמין
v.2 (3 of 3) 87/50678 זמין
v.3 (1 of 2) 87/50678 זמין
v.3 (2 of 2) 87/50678 זמין
v.4 87/50678 זמין