Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Sábháilte in:
Sonraí bibleagrafaíochta
OCLC:20719995
Údair chorparáideacha: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Teanga:Indonesian
English
Foilsithe / Cruthaithe: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Ábhair:
Global Resources Program:South Asia Materials Project (SAMP)
Formáid:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

Cur síos Local Call Number Stádas
v.1 (1 of 4) 87/50678 Ar fáil
v.1 (2 of 4) 87/50678 Ar fáil
v.1 (3 of 4) 87/50678 Ar fáil
v.1 (4 of 4) 87/50678 Ar fáil
v.2 (1 of 3) 87/50678 Ar fáil
v.2 (2 of 3) 87/50678 Ar fáil
v.2 (3 of 3) 87/50678 Ar fáil
v.3 (1 of 2) 87/50678 Ar fáil
v.3 (2 of 2) 87/50678 Ar fáil
v.4 87/50678 Ar fáil