Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Gorde:
Xehetasun bibliografikoak
OCLC:20719995
Egile korporatiboa: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Hizkuntza:Indonesian
English
Argitaratua: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Gaiak:
Global Resources Program:South Asia Materials Project (SAMP)
Formatua:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Deskribapena
Alearen deskribapena:At head of title: Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming.
Spine title: Detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau.
Vol. 4 in Indonesian.
Deskribapen fisikoa:4 v. : ill., maps ; 30 cm.
Bibliografia:Includes a bibliography.