Phase II, final report Tumbang Titi WPP XIVd SKP A : phase II studies of transmigration settlements development in West Kalimantan (package C)

Sábháilte in:
Sonraí bibleagrafaíochta
OCLC:20727856
Údair chorparáideacha: China Engineering Consultants, Indonesia. Direktorat Penyiapan Pemukiman. Direktorat Bina Program, BIEC International Inc
Teanga:English
Foilsithe / Cruthaithe: [Jakarta] : China Engineering Consultants, Inc. in association with BIEC International, Inc., [1984]
Ábhair:
Global Resources Program:South Asia Materials Project (SAMP)
Formáid:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Cur síos Local Call Number Stádas
1 of 3 87/50653 Ar fáil
2 of 3 87/50653 Ar fáil
3 of 3 87/50653 Ar fáil