PRC Engineering. (1984). Phase II draft report SKP F, WPP Ve, Tomage, package H, Irian Jaya: Screening studies (phase II) and detailed engineering plans (phase III-A) for transmigration development Irian Jaya-Package H. PRC Engineering Inc. and PT. Tricon Jaya.
Čikaški stil citiranja (17. izdanje)PRC Engineering. Phase II Draft Report SKP F, WPP Ve, Tomage, Package H, Irian Jaya: Screening Studies (phase II) and Detailed Engineering Plans (phase III-A) for Transmigration Development Irian Jaya-Package H. Jayapura, Irian Jaya: PRC Engineering Inc. and PT. Tricon Jaya, 1984.
MLA način citiranja (8. izdanje)PRC Engineering. Phase II Draft Report SKP F, WPP Ve, Tomage, Package H, Irian Jaya: Screening Studies (phase II) and Detailed Engineering Plans (phase III-A) for Transmigration Development Irian Jaya-Package H. PRC Engineering Inc. and PT. Tricon Jaya, 1984.