Citace podle APA (7th ed.)

PRC Engineering. (1984). Phase II draft report SKP F, WPP Ve, Tomage, package H, Irian Jaya: Screening studies (phase II) and detailed engineering plans (phase III-A) for transmigration development Irian Jaya-Package H. PRC Engineering Inc. and PT. Tricon Jaya.

Citace podle Chicago (17th ed.)

PRC Engineering. Phase II Draft Report SKP F, WPP Ve, Tomage, Package H, Irian Jaya: Screening Studies (phase II) and Detailed Engineering Plans (phase III-A) for Transmigration Development Irian Jaya-Package H. Jayapura, Irian Jaya: PRC Engineering Inc. and PT. Tricon Jaya, 1984.

Citace podle MLA (8th ed.)

PRC Engineering. Phase II Draft Report SKP F, WPP Ve, Tomage, Package H, Irian Jaya: Screening Studies (phase II) and Detailed Engineering Plans (phase III-A) for Transmigration Development Irian Jaya-Package H. PRC Engineering Inc. and PT. Tricon Jaya, 1984.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..