Hoppa till innehåll
CRL Library Catalog
Center for Research Libraries Center for Research Libraries
  • Accessing the CRL Collection
  • About the Catalog
  • Mitt konto
  • Logga in
  • Språk
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
Avancerad
  • Final report, SKP structure pl...
  • Hänvisa
  • Textmeddelande
  • Skicka per e-post
  • Skriv ut
  • Exportera posten
    • Exportera till: RefWorks
    • Exportera till: EndNoteWeb
    • Exportera till: EndNote
  • Lägg till i favoriter
  • Permanent länk

Final report, SKP structure planning (phase II) WPP/SKP XIXc/G Nanga Mau /

Sparad:
Bibliografiska uppgifter
OCLC:18221115
Institutionell upphovsman: Sinotech Engineering Consultants
Språk:English
Publicerad: [Jakarta] : Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, [1985]
Materialtyp:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

  • Beståndsuppgifter
  • Beskrivning
  • Katalogiseringsuppgifter
Borrow this resource

Item List

Beskrivning Local Call Number Status
1 of 2 87/80155 (H) Tillgänglig
2 of 2 87/80155 (H) Tillgänglig

Liknande verk

  • Final report, SKP structure planning (phase II) WPP/SKP XIXc/C Nanga Mau
    Publicerad: (1985)
  • Structure planning (phase II) final report for WPP/SKP/ XIXc/B Nanga Mau : structure planning (phase II) and detailed engineering planning (phase IIIA) for transmigration settlement, West Kalimantan (package D)
    Publicerad: (1985)
  • Final report detailed engineering planning (phase IIIA) for WPP/SKP XIXc/C Nanga Mau
    Publicerad: (1986)
  • Final report detailed engineering planning (phase IIIA) for WPP/SKP XIXc/B Nanga Mau
    Publicerad: (1987)
  • Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)
    Publicerad: (1986)

Sökalternativ

  • Sökhistorik
  • Avancerad sökning
  • Bläddra i katalogen

Behöver du hjälp?

  • Accessing the CRL Collection
  • Söktips

Follow CRL

Sign up for the Connect Newsletter

Leave Feedback

  • Accessibility Statement
  • Privacy Policy
  • Powered by VuFind and FOLIO
Laddar...