Phase II, final report Nanga Mahap WPP XVb SKP A : phase II studies of transmigration settlements development in West Kalimantan (package C)

Saved in:
Bibliographic Details
OCLC:20720187
Corporate Authors: China Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, BIEC International Inc
Language:Indonesian
Published: [Jakarta] : China Engineering Consultants, Inc. in association with BIEC International, Inc., [1985]
Subjects:
Global Resources Program:South Asia Materials Project (SAMP)
Format:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

LEADER 02405cam a2200457Ia 4500
001 in00005430632
003 OCoLC
005 19930803095209.0
007 he-amb---baca
008 891201s1985 io ab bd 000 0 ind d
010 |a 87941285 
035 |a (OCoLC)20720187  
040 |a AYR  |c AYR  |d CRL 
043 |a a-io--- 
049 |a CRLL 
099 |a 87/50649 
110 2 |a China Engineering Consultants. 
245 1 0 |a Phase II, final report Nanga Mahap WPP XVb SKP A :  |b phase II studies of transmigration settlements development in West Kalimantan (package C) 
260 |a [Jakarta] :  |b China Engineering Consultants, Inc. in association with BIEC International, Inc.,  |c [1985] 
300 |a xii, 93, [15] p. :  |b ill., maps ;  |c 30 cm. 
336 |a text  |b txt  |2 rdacontent. 
337 |a microform  |b h  |2 rdamedia. 
338 |a microfiche  |b he  |2 rdacarrier. 
500 |a At head of title: Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning & Programming. 
500 |a "April 1985." 
504 |a Bibliography: p. 92-93. 
533 |a Microfiche.  |b New Delhi, India :  |c Library of Congress Office,  |d 1987.  |e 3 microfiches ; 11 x 15 cm.  |f (87/50649) 
539 |a s  |b 1987  |d ii  |e n. 
650 0 |a Land use  |z Indonesia  |z Nanga Mahap. 
650 0 |a Regional planning  |z Indonesia  |z Nanga Mahap. 
650 0 |a Land settlement  |z Indonesia  |z Nanga Mahap. 
710 1 |a Indonesia.  |b Direktorat Jenderal Penyiapan Pemukiman.  |b Direktorat Bina Program. 
710 2 |a BIEC International Inc. 
740 0 |a Phase two, final report Nanga Mahap WPP XVb SKP A  |h microform. 
740 0 |a Phase 2, final report Nanga Mahap WPP XVb SKP A  |h microform. 
907 |a .b13502323  |b 01-19-22  |c 08-04-93 
998 |a crlm  |a sampm  |b 02-03-95  |c m  |d b  |e -  |f ind  |g io   |h 0  |i 2 
999 f f |i dafe9f50-9a54-5ce6-a111-c9a3d9213927  |s 053777dd-3609-58e8-a774-cf4e26694cdc  |t 0