Phase II screening studies, final report SKP C, WPP Ve Tomage : structure planning (phase II) and detailed engineering planning (phase III) for transmigration settlement package H, Irian Jaya

में बचाया:
ग्रंथसूची विवरण
OCLC:20463205
निगमित लेखकों: PRC Engineering Consultants, Tricon Jaya, P.T, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program
भाषा:English
प्रकाशित: Jayapura, Irian Jaya : PRC Engineering : Tricon Jaya, [1986]
विषय:
स्वरूप:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

विवरण Local Call Number स्थिति
1 of 2 86/81007 उपलब्ध
2 of 2 86/81007 उपलब्ध