Bhabha Atomic Research Centre & Soni, R. S. (1998). Qualification of PHT integrated piping system of 500 MWe PHWR. Bhabha Atomic Research Centre.
Chicago Style (17th ed.) CitationBhabha Atomic Research Centre and R. S. Soni. Qualification of PHT Integrated Piping System of 500 MWe PHWR. Mumbai: Bhabha Atomic Research Centre, 1998.
ציטוט MLABhabha Atomic Research Centre and R. S. Soni. Qualification of PHT Integrated Piping System of 500 MWe PHWR. Bhabha Atomic Research Centre, 1998.
אזהרה: ציטוטים אלה לעיתים לא מדויקים ב 100%.