Phase II screening studies, final report SKP A, WPP Ve Tomage : structure planning (phase II) and detailed engineering planning (phase III) for transmigration settlement, package H-Irian Jaya
Guardat en:
OCLC: | 20487274 |
---|---|
Autor corporatiu: | , , |
Idioma: | English |
Publicat: |
Jayapura, Irian Jaya :
PRC Engineering : Tricon Jaya,
[1986]
|
Matèries: | |
Format: | Monograph Microform Note that CRL will digitize material from the collection when copyright allows. |
Descripció de l’ítem: | At head of title: Republic of Indonesia, Directorate of Planning and Programming, Directorate General of Settlement Preparation, Ministry of Transmigration. "December 1986." |
---|---|
Descripció física: | vii, S-3, 56, [34] p. : ill., maps ; 30 cm. |
Bibliografia: | Bibliography: p. 53-56. |