Phase II screening studies, final report SKP A, WPP Ve Tomage : structure planning (phase II) and detailed engineering planning (phase III) for transmigration settlement, package H-Irian Jaya
محفوظ في:
OCLC: | 20487274 |
---|---|
مؤلفون مشاركون: | , , |
اللغة: | English |
منشور في: |
Jayapura, Irian Jaya :
PRC Engineering : Tricon Jaya,
[1986]
|
الموضوعات: | |
التنسيق: | Monograph Microform Note that CRL will digitize material from the collection when copyright allows. |
وصف المادة: | At head of title: Republic of Indonesia, Directorate of Planning and Programming, Directorate General of Settlement Preparation, Ministry of Transmigration. "December 1986." |
---|---|
وصف مادي: | vii, S-3, 56, [34] p. : ill., maps ; 30 cm. |
بيبلوغرافيا: | Bibliography: p. 53-56. |