Reconnaissance and outline planning and preparation of SP structure plans for transmigration settlements development Irian Jaya (package J) SKP Muting E2, WPP XXIIIc : phase IIIA, final report
Sábháilte in:
OCLC: | 20402596 |
---|---|
Údair chorparáideacha: | , , |
Teanga: | English |
Foilsithe / Cruthaithe: |
[Jakarta?] :
Euroconsult : Nusvey,
[1985]
|
Ábhair: | |
Formáid: | Monograph Microform Note that CRL will digitize material from the collection when copyright allows. |
Cur síos ar an mír: | At head of title: Republic of Indonesia, Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program. Spine title: SKP Muting E2 of WPP XXIIIc, final report. Vol. 2: Annex E, recommended technical specifications and bill of quantities. "December 1985." |
---|---|
Cur síos fisiciúil: | 2 v. : ill., maps, plans ; 30 cm. |
Leabharliosta: | Bibliography: p. 165-168 (v. 1) |