Reconnaissance and outline planning and preparation of SP structure plans for transmigration settlements development Irian Jaya (package J) SKP Muting E2, WPP XXIIIc : phase IIIA, final report

Tallennettuna:
Bibliografiset tiedot
OCLC:20402596
Yhteisötekijät: Euroconsult (Organization), Nusvey, P.T, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program
Kieli:English
Julkaistu: [Jakarta?] : Euroconsult : Nusvey, [1985]
Aiheet:
Aineistotyyppi:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Kuvaus
Huomautukset:At head of title: Republic of Indonesia, Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program.
Spine title: SKP Muting E2 of WPP XXIIIc, final report.
Vol. 2: Annex E, recommended technical specifications and bill of quantities.
"December 1985."
Ulkoasu:2 v. : ill., maps, plans ; 30 cm.
Bibliografia:Bibliography: p. 165-168 (v. 1)