Detailed survey and design (phase III) for transmigration settlement development in East Kalimantan, WPP Sangkulirang West (additional), SKP Kaubun, SKP Pengadan, SKP Bengalon Lembak North.

محفوظ في:
التفاصيل البيبلوغرافية
OCLC:20083807
مؤلفون مشاركون: Pacific Consultants International, Seecons Consortium, Indonesia. Direktorat Jenderal Cipta Karya
اللغة:English
منشور في: [Jakarta] : Pacific Consultants International in association with PT Seecons, [1982]
الموضوعات:
التنسيق:

وثيقة رسمية Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

جدول المحتويات:
  • 1. Main report
  • 2. Appendix to main report.