Causal modelling construction project performance /

Wedi'i Gadw mewn:
Manylion Llyfryddiaeth
OCLC:74492938
Prif Awdur: Lim, Bobby Ting Chuan
Awdur Corfforaethol: Heriot-Watt University
Iaith:English
Cyhoeddwyd: 1987.
Fformat:

Traethawd Ymchwil Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Disgrifiad Local Call Number Statws
P-90045962 Ar gael