Causal modelling construction project performance /

Saved in:
Bibliographic Details
OCLC:74492938
Main Author: Lim, Bobby Ting Chuan
Corporate Author: Heriot-Watt University
Language:English
Published: 1987.
Format:

Thesis Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

LEADER 01092nam a22002897a 4500
001 in00005462094
003 OCoLC
005 20061030100338.0
008 061027s1987 stk b 000 0 eng d
035 |a (OCoLC)74492938 
040 |a CRL  |c CRL  |d CRL 
049 |a CRLL 
099 |a P-90045962 
100 1 |a Lim, Bobby Ting Chuan. 
245 1 0 |a Causal modelling construction project performance /  |c Bobby Ting Chuan Lim. 
260 |c 1987. 
300 |a 6 microfiches. 
336 |a text  |b txt  |2 rdacontent. 
337 |a microform  |b h  |2 rdamedia. 
338 |a microfiche  |b he  |2 rdacarrier. 
500 |a BLDSC reference no.: DX81707. 
502 |a Thesis (doctoral)--Heriot-Watt University, 1987. 
710 2 |a Heriot-Watt University. 
907 |a .b13824387  |b 01-19-22  |c 11-03-93 
998 |a diss  |b 10-30-06  |c m  |d b  |e -  |f eng  |g stk  |h 0  |i 1 
999 f f |i 8e539a39-26df-5285-b717-4deed8400902  |s 3806c8d6-8e6b-5c0a-b8cc-776fb7ed4201  |t 0