Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)

Saved in:
书目详细资料
OCLC:20727838
Corporate Authors: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
语言:English
出版: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers, [1984]
主题:
Global Resources Program:South Asia Materials Project (SAMP)
格式:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

实物特征 Local Call Number 状态
1 of 2 87/50646 可用
2 of 2 87/50646 可用