Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)
Spremljeno u:
OCLC: | 20727838 |
---|---|
Autori kompanije: | , , |
Jezik: | English |
Izdano: |
[Pontianak] :
Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers,
[1984]
|
Teme: | |
Global Resources Program: | South Asia Materials Project (SAMP) |
Format: | Monograph Microform Note that CRL will digitize material from the collection when copyright allows. |
Borrow this resource
Item List
Opis | Local Call Number | Status |
---|---|---|
1 of 2 | 87/50646 | Dostupno |
2 of 2 | 87/50646 | Dostupno |