Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)
محفوظ في:
OCLC: | 20727838 |
---|---|
مؤلفون مشاركون: | , , |
اللغة: | English |
منشور في: |
[Pontianak] :
Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers,
[1984]
|
الموضوعات: | |
Global Resources Program: | South Asia Materials Project (SAMP) |
التنسيق: | Monograph Microform Note that CRL will digitize material from the collection when copyright allows. |
Borrow this resource
Item List
الوصف | Local Call Number | الحالة |
---|---|---|
1 of 2 | 87/50646 | متاح |
2 of 2 | 87/50646 | متاح |