Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)
Salvato in:
OCLC: | 20727838 |
---|---|
Enti autori: | , , |
Lingua: | English |
Pubblicazione: |
[Pontianak] :
Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers,
[1984]
|
Soggetti: | |
Global Resources Program: | South Asia Materials Project (SAMP) |
Natura: | Monograph Microform Note that CRL will digitize material from the collection when copyright allows. |
Descrizione del documento: | At head of title: Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming. Spine title: SKP structure planning (phase II) final report WPP/SKP XIXa/B Nanga Pinoh. Title on added t.p.: Structure planning (phase II) final report WPP/SKP XIXa/B Nanga Pinoh. "December 1984." |
---|---|
Descrizione fisica: | 105 p. in various pagings : ill., maps ; 29 cm. |
Bibliografia: | Includes a bibliography. |