Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh : transmigration settlement project, West Kalimantan (package D)

Salvato in:
Dettagli Bibliografici
OCLC:20727838
Enti autori: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Lingua:English
Pubblicazione: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers, [1984]
Soggetti:
Global Resources Program:South Asia Materials Project (SAMP)
Natura:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Descrizione
Descrizione del documento:At head of title: Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming.
Spine title: SKP structure planning (phase II) final report WPP/SKP XIXa/B Nanga Pinoh.
Title on added t.p.: Structure planning (phase II) final report WPP/SKP XIXa/B Nanga Pinoh.
"December 1984."
Descrizione fisica:105 p. in various pagings : ill., maps ; 29 cm.
Bibliografia:Includes a bibliography.