Final report, SKP structure planning (phase II) WPP/SKP XXIa/C Sungai Antu /

Sparad:
Bibliografiska uppgifter
OCLC:18221104
Institutionell upphovsman: Sinotech Engineering Consultants
Språk:English
Publicerad: [Jakarta] : Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, [1986]
Materialtyp:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Beskrivning Local Call Number Status
1 of 2 87/80154 (H) Tillgänglig
2 of 2 87/80154 (H) Tillgänglig