Final report, SKP structure planning (phase II) WPP/SKP XXIa/C Sungai Antu /

Salvato in:
Dettagli Bibliografici
OCLC:18221104
Ente Autore: Sinotech Engineering Consultants
Lingua:English
Pubblicazione: [Jakarta] : Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, [1986]
Natura:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Descrizione
Descrizione del documento:Master microform held by: DLC.
Descrizione fisica:102 p. in various pagings : ill., maps (some folded) ; 30 cm.