Final report, SKP structure planning (phase II) WPP/SKP XXIa/C Sungai Antu /

Enregistré dans:
Détails bibliographiques
OCLC:18221104
Collectivité auteur: Sinotech Engineering Consultants
Langue:English
Publié: [Jakarta] : Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, [1986]
Format:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Description
Description:Master microform held by: DLC.
Description matérielle:102 p. in various pagings : ill., maps (some folded) ; 30 cm.