Final report, SKP structure planning (phase II) WPP/SKP XXIa/C Sungai Antu /

Guardado en:
Detalles Bibliográficos
OCLC:18221104
Autor Corporativo: Sinotech Engineering Consultants
Lenguaje:English
Publicado: [Jakarta] : Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, [1986]
Formato:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Descripción
Notas:Master microform held by: DLC.
Descripción Física:102 p. in various pagings : ill., maps (some folded) ; 30 cm.