APA aipamena

Sinotech Engineering Consultants. (1986). Final report, SKP structure planning (phase II) WPP/SKP XXIa/C Sungai Antu. Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming.

Chicago Style aipamena

Sinotech Engineering Consultants. Final Report, SKP Structure Planning (phase II) WPP/SKP XXIa/C Sungai Antu. [Jakarta]: Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, 1986.

MLA aipamena

Sinotech Engineering Consultants. Final Report, SKP Structure Planning (phase II) WPP/SKP XXIa/C Sungai Antu. Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming, 1986.

Kontuz: berrikusi erreferentzia hauek erabili aurretik.