Phase II screening studies, final report SKP E, WPP If Berma : structure planning (phase II) and detailed engineering planning (Phase III) for transmigration settlement package H-Irian Jaya

Uloženo v:
Podrobná bibliografie
OCLC:20463276
Korporace: PRC Engineering Consultants, Tricon Jaya, P.T, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program
Jazyk:English
Vydáno: Jayapura, Irian Jaya : PRC Engineering : Tricon Jaya, [1986]
Témata:
Médium:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Popis Local Call Number Stav
1 of 2 86/81417 Dostupné
2 of 2 86/81417 Dostupné