Phase II screening studies, final report SKP E, WPP If Berma : structure planning (phase II) and detailed engineering planning (Phase III) for transmigration settlement package H-Irian Jaya

محفوظ في:
التفاصيل البيبلوغرافية
OCLC:20463276
مؤلفون مشاركون: PRC Engineering Consultants, Tricon Jaya, P.T, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program
اللغة:English
منشور في: Jayapura, Irian Jaya : PRC Engineering : Tricon Jaya, [1986]
الموضوعات:
التنسيق:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

الوصف
وصف المادة:At head of title: Republic of Indonesia, Directorate of Planning and Programming, Directorate General of Settlement Preparation, Ministry of Transmigration.
"February 1986."
وصف مادي:viii, S-3, 68, [22] p. : ill., maps ; 30 cm.
بيبلوغرافيا:Bibliography: p. 65-68.