Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Saved in:
书目详细资料
OCLC:20719995
Corporate Authors: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
语言:Indonesian
English
出版: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
主题:
Global Resources Program:South Asia Materials Project (SAMP)
格式:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

实物特征 Local Call Number 状态
v.1 (1 of 4) 87/50678 可用
v.1 (2 of 4) 87/50678 可用
v.1 (3 of 4) 87/50678 可用
v.1 (4 of 4) 87/50678 可用
v.2 (1 of 3) 87/50678 可用
v.2 (2 of 3) 87/50678 可用
v.2 (3 of 3) 87/50678 可用
v.3 (1 of 2) 87/50678 可用
v.3 (2 of 2) 87/50678 可用
v.4 87/50678 可用