Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Đã lưu trong:
Chi tiết về thư mục
OCLC:20719995
Nhiều tác giả của công ty: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Ngôn ngữ:Indonesian
English
Được phát hành: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Những chủ đề:
Global Resources Program:South Asia Materials Project (SAMP)
Định dạng:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

Miêu tả Local Call Number Trạng thái
v.1 (1 of 4) 87/50678 Sẵn có
v.1 (2 of 4) 87/50678 Sẵn có
v.1 (3 of 4) 87/50678 Sẵn có
v.1 (4 of 4) 87/50678 Sẵn có
v.2 (1 of 3) 87/50678 Sẵn có
v.2 (2 of 3) 87/50678 Sẵn có
v.2 (3 of 3) 87/50678 Sẵn có
v.3 (1 of 2) 87/50678 Sẵn có
v.3 (2 of 2) 87/50678 Sẵn có
v.4 87/50678 Sẵn có