Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Sparad:
Bibliografiska uppgifter
OCLC:20719995
Institutionella upphovsmän: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Språk:Indonesian
English
Publicerad: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Ämnen:
Global Resources Program:South Asia Materials Project (SAMP)
Materialtyp:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

Beskrivning Local Call Number Status
v.1 (1 of 4) 87/50678 Tillgänglig
v.1 (2 of 4) 87/50678 Tillgänglig
v.1 (3 of 4) 87/50678 Tillgänglig
v.1 (4 of 4) 87/50678 Tillgänglig
v.2 (1 of 3) 87/50678 Tillgänglig
v.2 (2 of 3) 87/50678 Tillgänglig
v.2 (3 of 3) 87/50678 Tillgänglig
v.3 (1 of 2) 87/50678 Tillgänglig
v.3 (2 of 2) 87/50678 Tillgänglig
v.4 87/50678 Tillgänglig