Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Αποθηκεύτηκε σε:
Λεπτομέρειες βιβλιογραφικής εγγραφής
OCLC:20719995
Συλλογικό Έργο: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Γλώσσα:Indonesian
English
Έκδοση: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Θέματα:
Global Resources Program:South Asia Materials Project (SAMP)
Μορφή:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

Περιγραφή Local Call Number Κατάσταση
v.1 (1 of 4) 87/50678 Στη βιβλιοθήκη
v.1 (2 of 4) 87/50678 Στη βιβλιοθήκη
v.1 (3 of 4) 87/50678 Στη βιβλιοθήκη
v.1 (4 of 4) 87/50678 Στη βιβλιοθήκη
v.2 (1 of 3) 87/50678 Στη βιβλιοθήκη
v.2 (2 of 3) 87/50678 Στη βιβλιοθήκη
v.2 (3 of 3) 87/50678 Στη βιβλιοθήκη
v.3 (1 of 2) 87/50678 Στη βιβλιοθήκη
v.3 (2 of 2) 87/50678 Στη βιβλιοθήκη
v.4 87/50678 Στη βιβλιοθήκη