Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Gespeichert in:
Bibliographische Detailangaben
OCLC:20719995
Körperschaften: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Sprache:Indonesian
English
Veröffentlicht: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Schlagworte:
Global Resources Program:South Asia Materials Project (SAMP)
Format:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Borrow this resource

Item List

Notice: Some item lists may not be in chronological order. We appreciate your patience as CRL addresses this issue. For more assistance, click here.

Beschreibung Local Call Number Status
v.1 (1 of 4) 87/50678 Verfügbar
v.1 (2 of 4) 87/50678 Verfügbar
v.1 (3 of 4) 87/50678 Verfügbar
v.1 (4 of 4) 87/50678 Verfügbar
v.2 (1 of 3) 87/50678 Verfügbar
v.2 (2 of 3) 87/50678 Verfügbar
v.2 (3 of 3) 87/50678 Verfügbar
v.3 (1 of 2) 87/50678 Verfügbar
v.3 (2 of 2) 87/50678 Verfügbar
v.4 87/50678 Verfügbar