Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)

Bewaard in:
Bibliografische gegevens
OCLC:20719995
Coauteurs: Sinotech Engineering Consultants, Indonesia. Direktorat Jenderal Penyiapan Pemukiman. Direktorat Bina Program, Nasuma Putra Consulting Engineers
Taal:Indonesian
English
Gepubliceerd in: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consultants Engineers, [1986]
Onderwerpen:
Global Resources Program:South Asia Materials Project (SAMP)
Formaat:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

Inhoudsopgave:
  • v. 1. Main report
  • v. 2. Appendix to main report
  • v. 3. Maps
  • v. 4. Amendments to standard tender documents.