Skip to content
CRL Library Catalog
Center for Research Libraries Center for Research Libraries
  • Accessing the CRL Collection
  • About the Catalog
  • Your Account
  • Login
  • Language
    • English
    • Deutsch
    • Español
    • Français
    • Italiano
    • 日本語
    • Nederlands
    • Português
    • Português (Brasil)
    • 中文(简体)
    • 中文(繁體)
    • Türkçe
    • עברית
    • Gaeilge
    • Cymraeg
    • Ελληνικά
    • Català
    • Euskara
    • Русский
    • Čeština
    • Suomi
    • Svenska
    • polski
    • Dansk
    • slovenščina
    • اللغة العربية
    • বাংলা
    • Galego
    • Tiếng Việt
    • Hrvatski
    • हिंदी
Advanced
  • Final report detailed engineer...
  • Cite this
  • Text this
  • Email this
  • Print
  • Export Record
    • Export to RefWorks
    • Export to EndNoteWeb
    • Export to EndNote
  • Save
  • Permanent link
Export Ready — 

Final report detailed engineering planning (phase IIIA) for WPP/SKP XIXc/B Nanga Mau.

Saved in:
Bibliographic Details
OCLC:18221551
Corporate Authors: Sinotech Engineering Consultants, Nasuma Putra Consulting Engineers, Indonesia. Direktorat Bina Program Penyiapan Pemukiman
Language:English
Indonesian
Published: [Pontianak] : Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers, [1987]
Global Resources Program:South Asia Materials Project (SAMP)
Format:

Monograph Microform

Note that CRL will digitize material from the collection when copyright allows.

  • Holdings
  • Description
  • Table of Contents
  • Staff View
Table of Contents:
  • v. 1. Main report
  • v. 2. Appendix to main report
  • v. 3. Maps
  • v. 4. Amendment to tender document.

Similar Items

  • Final report detailed engineering planning (phase IIIA) for WPP/SKP XIXc/C Nanga Mau
    Published: (1986)
  • Final report, detailed engineering planning (phase IIIA) for WPP/SKP XIXc/G Nanga Mau : transmigration settlement project West Kalimantan (package D)
    Published: (1986)
  • Final report, SKP structure planning (phase II) WPP/SKP XIXc/C Nanga Mau
    Published: (1985)
  • Final report, SKP structure planning (phase II) WPP/SKP XIXc/G Nanga Mau
    Published: (1985)
  • Structure planning (phase II) final report for WPP/SKP/ XIXc/B Nanga Mau : structure planning (phase II) and detailed engineering planning (phase IIIA) for transmigration settlement, West Kalimantan (package D)
    Published: (1985)

Search Options

  • Search History
  • Advanced Search
  • Browse the Catalog

Need Help?

  • Accessing the CRL Collection
  • Search Tips

Follow CRL

Sign up for the Connect Newsletter

Leave Feedback

  • Accessibility Statement
  • Privacy Policy
  • Powered by VuFind and FOLIO
Loading...